Quote:
Originally Posted by Pdelcast
I think we are confused here -- The second BUILD of MMM has not yet happened. There have been several batches built, but all of those are wired controllers.
The second build will take place a little later this month, we are still waiting on a couple of parts. The second build will have the SMT 6.5mm connectors.
Patrick
|
Right-o, thanks Patrick. I ordered bullets anyway, so the bullets don't worry me