View Single Post
Old
  (#4)
Pdelcast
RC-Monster Titanium
 
Pdelcast's Avatar
 
Offline
Posts: 1,697
Join Date: Mar 2008
05.13.2008, 06:36 PM

Quote:
Originally Posted by skellyo View Post
That makes sense. Very little manual labor to place them and the reflow have to be done anyhow. I'd imagine it'll make it easier to test each of them after build too. Heck, you could easily design/build a setup to plug them in and have dedicated ATE run the test.

When you go to the SMT connectors, will the ESC's include male pigtails to plug into them?
Yep,

We are including 5" pigtails for all the connections.


Patrick del Castillo
President, Principle Engineer
Castle Creations
   
Reply With Quote