Thread: Second Batch
View Single Post
Old
  (#25)
Electric Eel
Guest
 
Posts: n/a
06.15.2008, 06:29 AM

Second batch is delayed and a new board design may even be in the works!

Quote Lee Estingoy, Castle Engineer
"It's going to be a few weeks down the road. One of the components is not living up to the manufacturer's specs, and it is letting all of us down. We have a replacement configuration and we are tooling up for that. This involved getting the new part in qty, and possibly new control board design -- I'm not the engineer on this part, so don't hold me to any of this.

We feel the pain of this delay, perhaps even as much as the consumers. , so flogging us online will not be needed, nor will it speed this process.

Thanks,

Lee"
   
Reply With Quote