Thread: mmm v2 close
View Single Post
Old
  (#11)
droopy
Guest
 
Posts: n/a
07.17.2008, 12:12 AM

I got a e-mail from CC today here is what it said>:
Unfortunately right now all Monster Max's sent in for repair are on engineering hold. There was a component supply problem that forced us to redesign the control board. We have finished the new design and our in-house testing. We have sent out a dozen or so controllers for independent verification that the fix has worked. As soon as we verify the new design, we will be ramping up full production; and you will get one of the first controllers from the new batch. By best estimates, we are looking at a 2-3 week lead time, if everything goes smoothly. We will update everyone with a failed controller if there are any hang ups or problems with the new design. We are confident in the new design, we just want to verify everything so we can avoid any future problems. I apologize for the longer than normal repair time, and any frustration and withdrawals caused by the down time. We will be sending a token of our appreciation to everyone with a failed controller, for their patience and understanding as we resolve this issue. If you have any questions or concerns, please don't hesitate to ask.
Congrats traxxasrevony on being one of the lucky 12 I hope all is well.
   
Reply With Quote