|
10.29.2008, 09:39 PM
hmm maybe a 6s 4300 will do the trick then, that will provide a little more watt/hr than the 5s 5k giving me what I need to get a 30min main in. With a 45min main it won't be a big deal doing 1 long pit to swap out packs making me even w/ the truggies.
8ight-e (B&T) MMM - Hyperion Lipos
Ofna Hyper SC 10 Pro - Medusa 4800kv
|