|
08.22.2010, 03:59 AM
if you can get the packs to fit in your truck, run them both in parallel. it will double your run-time and REDUCE voltage spikes. the voltage will be the same unloaded and a little higher loaded due to less stress on the packs.
They say a good mechanic only needs 2 tools - WD40 & Duct tape. If it moves, and its not supposed to, duct tape. If it doesn't move, and its supposed to, WD40.
|