View Single Post
Old
  (#6)
Darren
Guest
 
Posts: n/a
05.06.2006, 05:10 AM

Here comes answers.

Cells have been used in stock maxx chassis on both occasions, so wouldn't have shorted, and arent in a config that is possble to short a single cell.

The cells were in different positions both times. Once the third in the pack, the second time, the final cell in the pack.

Gearing, well they've shorted out on two different E-Maxx's I have. An HV-Maxx E-Maxx that was crawling mostly, 70/14 gearing. And my 9XL/9920 setup blasting around in 2nd gear, 51/16 gearing.

Vent? I'm un-sure what this means.

By Melt, I mean that they melted the intellect shrink on the cells, melted the other pack heatshrink, melted the solder, started smoking.

At first I thought the smoke was my ESC :002: :005: .

Last edited by Darren; 05.06.2006 at 05:12 AM.
   
Reply With Quote