RC-Monster Forums  

Go Back   RC-Monster Forums > Support Forums > Castle Creations

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old
  (#11)
Dadx2mj
RC-Monster Carbon Fiber
 
Dadx2mj's Avatar
 
Offline
Posts: 81
Join Date: May 2008
08.18.2008, 06:20 PM

Quote:
Originally Posted by Arct1k View Post
He has had 3 fail - One tooks 3 weeks, the next 6 and you;ve had the last one for 6 with an ETA of 8 i.e. 3 + 6 + 8 = 17 (across 3 controllers)

It might pay to post more details of your setup as 3 controllers on a rustler is a lot of break.
Yeah that is how I got to 17 weeks.

I have been through my set up with Castle Tech support guys a couple of times. Both Bernie and Thomas have been really good to talk with and a lot of good info but both confirm there is really nothing in my set up that is wrong. We have covered gearing, tire size, batteries, cooling you name it. My set up is good. The first failure was of my own doing (switch wires tore from circuit board) and Castle still covered it no questions asked. This is part of why I became such a big Castle fan. My only complaint is how long it is taking to get this one replaced. Everything else about Castle has been a good experience for me but two months is too long to have to wait.


Blindman Racing
Powered by Mamba 5700
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com