RC-Monster Forums  

Go Back   RC-Monster Forums > RC-Monster Area > General Discussion

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old
  (#2)
azjc
Guest
 
Posts: n/a
09.27.2008, 08:03 AM

Quote:
Originally Posted by TDC57 View Post
Well for the last 3 weeks end’s I’ve been busting my butt & my wallet putting in my first patio and “then I got a wild hair” to also add a fire pit. All of neighbors give me a hard time for (over engineering it) LOL.LOL with 4” of gravel, 2” of sand, 4” of concrete, then I topped it all off with 1’ of motor and then set-in 90mm stones, Ooooohhhhh my BACK..

Here is how it brakes down:
• 16Lf of 3” Perforated pipe (Drainage)
• 2,500 lbs of gravel
• 700 lbs of sand
• 2 yards of concrete
• 1,880 lbs of motor
• 6,400 lbs of stone (did I mention my back hurts!)

Here is what it looks like finally all completed @ 12:30 am, not too shabby for a do it yourself homeowner

Have a great one guys..






P.S.
Got any pictures of your first projects ??.
looks good
you have 1800 LBs of motor?.....I am assumming you mean mortar
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com