RC-Monster Forums  

Go Back   RC-Monster Forums > Support Forums > General Electric

 
 
Thread Tools Rating: Thread Rating: 32 votes, 4.94 average. Display Modes
Prev Previous Post   Next Post Next
Old
  (#10)
ANGRY-ALIEN
RC-Monster Aluminum
 
ANGRY-ALIEN's Avatar
 
Offline
Posts: 809
Join Date: Jan 2008
Location: JAMAICA
07.16.2010, 08:50 AM

It can be done, but at a big, big, big risk... I would not advice it... you will need to remove the wall 'ground' on at least one of the supplies (if you don't, they will shot down when you try to connect them)... if this is done, the metal case will be 'energized' (a technical person can step in here)... meaning if both cases were to be come in contact, you will have a big spark/short... I tried with one ground removed and both grounds removed... you can actually measure the voltage between the two cases when both grounds are off (12v).

If you really need to do this, keep them both separate with some insulation... you will still be running a risking of damaging the supplies internals without them being grounded...


Alien
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com