RC-Monster Forums  

Go Back   RC-Monster Forums > RC-Monster Area > General Discussion

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
Old
  (#8)
pinkpanda3310
RC-Monster Titanium
 
pinkpanda3310's Avatar
 
Offline
Posts: 1,152
Join Date: Sep 2008
11.14.2010, 11:13 AM

+1 I saw a few issues with the construction as well. Particularly, onsite safety. Some of the methods and practices would not pass the Australian 'Worksafe' authority. Worksafe have their place but they really do slow the pace of construction.

I wonder if that was just a day at the office or if it was intended as a show peice for the expo. It required an enormous amount of manpower. Do they have enough work to keep them all going?

We also use cranes like that at work but never 7 at one time

I know of another company that imports prefabricated steel from China but they rarely get a job that all fits with no issues.

Last edited by pinkpanda3310; 11.14.2010 at 11:16 AM.
   
Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump







Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com