06.19.2008, 10:19 PM
Beta testers don't usually have to pay for the product they are testing though.
|
|
|
|
|
|
|
|
Supermaxx
Offline
Posts: 2,031
Join Date: Oct 2007
Location: Earth
|
06.20.2008, 12:34 AM
Quote:
Originally Posted by e-mike
this is my case...mine still run perfect,,but for how much time  the esc have about 2 hour of hard street bashing,,im pretty scared to see my maxx stop in the middle of my run 
|
I'm with you on this one. It's scary and frustrating to have this happen and then wait for a long time to get a replacement.
Castle Neu 1520 on 6S LiPo Powered Gmaxx (Nitro Killer)
Predator with OS .21TM
Supermaxx with Mach .26
Revo with OS .18TZ
Kyosho ST-RR Conversion
Ofna CR with Tekin ESC/Motor (2)
|
|
|
|
|
|
|
|
RC-Monster Carbon Fiber
Offline
Posts: 119
Join Date: Dec 2007
|
06.20.2008, 12:51 AM
i Think CC is doing a good job under the surcimstances. The only thing that is missing (IMO) is more information from CC. Like, the problem IS ........ We are making these changes....... The ETA is.......
|
|
|
|
|
|
|
|
RC-Monster Mod
Offline
Posts: 6,597
Join Date: Apr 2007
Location: NJ
|
06.20.2008, 06:12 AM
Like this you mean :
We have to re-tool to use the new part.... But we are almost done, got about two weeks before they are coming off the production line again
Patrick...
|
|
|
|
|
|
|
|
RC-Monster Carbon FIBRE NOT FIBER!
Offline
Posts: 701
Join Date: Apr 2008
Location: Brisbane, Australia
|
06.20.2008, 06:29 AM
10 days eta. enough to fulfill ALL of mikes orders. within the month most should have them, and mike will have to sell that ferrarri
hyper 8.5 pro SOLD!
Monster Max Still Working...
JR SX3
Neu 1512 2D/S
12t pinion
4800 zippy-r
XRAY xt8
MMM
Neu 1512 3D/F
11t pinion
6s 5000 Flightmax/ 4s 4000 Turningy
|
|
|
|
|
|
|
|
Guest
|
06.20.2008, 06:57 AM
there is alot of difference with changing parts only or redesigning the part of the board where a new part will be. if the parts are almost identical in everyway, its a matter of just loading the component reel on the feeder ,reprogramming the fuji or DEK then away you go . however if the supplier sold the new components in tubes then its more time consuming, even morseo if the part is not the same dimensionally. this means board design changes, solder paste screens need to be made, gerber files to be modified and in some cases completely new pcbs made,a different feeder needs to be jigged up and then a full QA check along with new functional testing. we do part changes often with products 100 times more complex but speed comes down to how big the work force is and how much experience they have. we do take alot for granted and its not like replacing a light bulb. i too am awaiting my mmm, unfortunately i know what goes on and its not a weekend thing.
|
|
|
|
|
|
|
|
RC-Monster Titanium
Offline
Posts: 1,697
Join Date: Mar 2008
|
06.20.2008, 10:32 AM
Quote:
Originally Posted by 123revo
there is alot of difference with changing parts only or redesigning the part of the board where a new part will be. if the parts are almost identical in everyway, its a matter of just loading the component reel on the feeder ,reprogramming the fuji or DEK then away you go . however if the supplier sold the new components in tubes then its more time consuming, even morseo if the part is not the same dimensionally. this means board design changes, solder paste screens need to be made, gerber files to be modified and in some cases completely new pcbs made,a different feeder needs to be jigged up and then a full QA check along with new functional testing. we do part changes often with products 100 times more complex but speed comes down to how big the work force is and how much experience they have. we do take alot for granted and its not like replacing a light bulb. i too am awaiting my mmm, unfortunately i know what goes on and its not a weekend thing.
|
Yep.
So far: Circuit board changes are complete. Gerbers have been produced, and new PCBs are in process, should have them next Friday. Stencils are ordered, should have them Wednesday. Machine reprogramming should happen sometime next week.
Enough details?
Patrick del Castillo
President, Principle Engineer
Castle Creations
|
|
|
|
|
|
|
|
RC-Monster Mod
Offline
Posts: 6,597
Join Date: Apr 2007
Location: NJ
|
06.20.2008, 11:01 AM
Ouch I dread to think how much this has cost you!
|
|
|
|
|
|
|
|
Always Willing to Obtain More Knowledge
Offline
Posts: 1,482
Join Date: Oct 2006
Location: Chicago
|
06.20.2008, 11:10 AM
Quote:
Originally Posted by Pdelcast
Yep.
So far: Circuit board changes are complete. Gerbers have been produced, and new PCBs are in process, should have them next Friday. Stencils are ordered, should have them Wednesday. Machine reprogramming should happen sometime next week.
Enough details?
|
i appreciate the hard work,
|
|
|
|
|
|
|
|
RC-Monster Aluminum
Offline
Posts: 554
Join Date: Jan 2007
Location: Singapore
|
06.20.2008, 11:46 AM
Patrick is very active. Glad to have this kind of involvement from a vendor.
I have one question though Patrick, I order MMM from a different site and they say that they should get the ESC from CC on the 24th of June. Does this mean I'll be getting the old (possibly faulty) one? Hope not.
|
|
|
|
|
|
|
|
RC-Monster Mod
Offline
Posts: 6,597
Join Date: Apr 2007
Location: NJ
|
06.20.2008, 11:51 AM
It means they have out of date info - You are getting it from the proverbial horse on RCM!
|
|
|
|
|
|
|
|
RC-Monster Carbon Fiber
Offline
Posts: 433
Join Date: Oct 2007
|
06.20.2008, 12:06 PM
Sweet. I am excited to get my MMM. My old mtronics has been acting funny and its either the MMM or build a V-twin which I am really not wanting to do.
|
|
|
|
|
|
|
|
Something, anything, nothing
Offline
Posts: 2,747
Join Date: Mar 2006
Location: Houston, TX
|
06.20.2008, 12:21 PM
Patrick, you are definitely the exception and not the rule when in comes to customer service!
|
|
|
|
|
|
|
|
RC-Monster Titanium
Offline
Posts: 1,697
Join Date: Mar 2008
|
06.20.2008, 03:44 PM
Quote:
Originally Posted by TruckBasher
Patrick is very active. Glad to have this kind of involvement from a vendor.
I have one question though Patrick, I order MMM from a different site and they say that they should get the ESC from CC on the 24th of June. Does this mean I'll be getting the old (possibly faulty) one? Hope not.
|
That's from an old shipment estimate. You will be getting one from the new batch.
Patrick del Castillo
President, Principle Engineer
Castle Creations
|
|
|
|
|
|
|
|
RC-Monster Carbon Fiber
Offline
Posts: 52
Join Date: Apr 2008
|
06.20.2008, 05:21 PM
patrick do will have a huge bacht is time??
Last edited by killermmn; 06.20.2008 at 09:02 PM.
|
|
|
|
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
|
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
Powered by vBulletin® Version 3.8.11 Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com
|
 |