yay

*tripplepost!*
On Monday my shippent form towerhobbbies arrived and with it the last needed parts to get my g-maxx ready to roll.
So from monday evening till yesterday night I completely disassembled the g-maxx an rebuilt it, but this time using threadlock, sealing the FLM hybrid diff cases and shimming the pinions.

Hope this keeps any dust away from my diffs.
Furthermore I had to modify the shock mounting system / shock stand offs because the I wasn't satisfied with the way you had to tighten them.

You can see the flat spots I had to dremel to get a grip with tolls, before it was completely round and you had no way to lock the bolt while tightening the hex nut.
I assume nobody has an idea what I'm talking about or how this system works, I'll take detailed pictures of that later, as I'm going to take pictures of the whole chassis later today.
And I'm going to put this monster on a scale and look how heavy it is.
To do:
Tape the tires and get some venting holes into them.
Waiting for money to rain form the skies so I can go buy some batteries.
edit: would really love to edit the title of this thread by adding something like "g-maxx build starting page 3". But it seams this is not possible with the used board-software